小草免费在线视频
  • Bulkhead and shielding install

    Protective shielding and 16 bulkheads are installed to isolate Unit 6 from the operating units. By installing the shielding, workers can remain in the vault when the Fueling Machine Trolley performs spent fuel runs, which generally occurs one time every 24 hour.

    Once the bulkheads are installed, vault pressure testing is completed to ensure Unit 6 has been fully isolated from the three remaining operating units.

    16 bulkheads; 7.2 tons each

    #NuclearAgainstRacism

    We stand in solidarity with Black, Indigenous and People of Colour (BIPOC) communities across the world in the unquestionable proclamation that the lives of BIPOC Matter. 

    Stay in touch

    Sign up for our monthly eNewsletter

    The shortcode with the name issuu-popup dose not exist.

    小草免费在线视频
  • 欧美大尺码久久夜